[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Metrol & Heidelberg
Gareth Lumsden wrote:
>
> Oh dear, If the new system lets up trains though before down trains,
> Hillside will loose quite a lot of money on fines.
But the lateness of the up trains would be fairly readily detected when
they get into the city, whereas the lateness of a train arriving at
Hurstbridge is much less evident.
Trains are scheduled
> (during the 20 min frequency period):
> Down HDB xx:17 - ROS xx:20
> Up ROS xx:18 - HDB xx:21
> As you can see, trains are sched in both directions at the same time on
> the single track.
Which appears to be incredibly incompetent. Is there some reason for it?
Eddie Oliver