[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Metrol & Heidelberg



On 27 Sep 1999, Christopher_Martin GORDON wrote:

> It will have some automation of the single line between Heidelberg
> and Rosanna Junction, like the single line between Bunyip and Longwarry
> 
> That is a first there first through, but the sections are designed
> so that an up train doesn't have to wait for a down train.
> (ie up trains set up the single line 7km before, but down trains only
> 3km before, this is provided that the signle line is clear.)
> 
> With automation like this then there doesn't realy need to be anyone
> controlling things, expect to put the train numbers into the vt100
> for Metrol.
> 
> Trains cross at Heidelberg or Rossana, so the single line would have
> to be set up so that the correct train gets to go first.  Wait and
> see what happens.

Oh dear, If the new system lets up trains though before down trains,
Hillside will loose quite a lot of money on fines.  Trains are scheduled
(during the 20 min frequency period):
Down HDB xx:17 - ROS xx:20
Up   ROS xx:18 - HDB xx:21
As you can see, trains are sched in both directions at the same time on
the single track.  Currently down trains use the single line first,
crossing Up trains at Rosanna Junction.  This works out fairly well,
travel time is approx 2 mins between those two stations, and up trains are
usuallu only 1 min late ex HDB.

Gareth.

-------------------------------------------------------------------------
 Gareth Lumsden     s9763278@minyos.its.rmit.edu.au    glums112@yahoo.com
--------------------------------------------------------------------------
 Gareth's Railway Web Page        http://minyos.its.rmit.edu.au/~s9763278
--------------------------------------------------------------------------