[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: New Heidelberg Arrangements (WAS: Ringwood .....)



Stephen Devenish wrote:

> The new Heidelberg arrangement will keep the up end crossover from the Up
> track to the down track but will loose the down track to up track to
> siding.  The modified Three throw at the down end will be removed and a 8.7
> 60kg installed.  The siding will be removed.  All points to be motorised
> and interlocking removed.
>
> Stephen Devenish
>
>

Let me see if I have got this right.
There will be a trailing crossover at the up end, thus allowing an up train to
depart from the down platform.
Is that correct?

John McCallum