Re: New Heidelberg Arrangements (WAS: Ringwood .....)



The new Heidelberg arrangement will keep the up end crossover from the Up
track to the down track but will loose the down track to up track to
siding.  The modified Three throw at the down end will be removed and a 8.7
60kg installed.  The siding will be removed.  All points to be motorised
and interlocking removed.

Hope this clears things up 


Stephen Devenish


Gareth Lumsden <s9763278@minyos.its.rmit.edu.au> wrote in article
<Pine.SOL.3.96.990322115946.10230D-100000@minyos.its.rmit.edu.au>...
> On Sat, 20 Mar 1999, Tony Gatt wrote:
> > 
> > When you say that, does that mean that Up movements from the down
platform
> > will become obsolete??
> > 
> > One would think that the 2 crossovers at Heidelberg should be left for
some
> > form of flexibility.
> > or would they just shunt from Down Platform to Down line (single line)
and
> > back onto the Up Platform??
> > 
> > It never ceases to amaze me...
> 
> Tony,
> AFAIK the new track arrangements at Heidelberg will be as follows:
> 
>           /---------------\
>  --------/  2222222222222  \
> UP END      1111111111111   ---------------- DOWN END
>  ---------------------------/
> 
> i.e. no points at the up end for flexibility, no sidings for emergencies.
> Bloody crazy....
> 