[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Three Position Signalling



Notagunzel (yes I'm replying to my own post) <notagunzel@bigfoot.com>
wrote in message hDCK3.46$bM2.2693@nsw.nnrp.telstra.net">news:hDCK3.46$bM2.2693@nsw.nnrp.telstra.net...

> From SW 536/95:

> "On Friday, 1.12.95, automatic gauge detection was provided to
control
> the illuminated gauge indicator on
> Post TOT/U8."

> I really should check the facts before posting. |-)

But I now see, on Signalling Diagram 10/99, dated 16/6/99, that Post
TOT/U8 is still shown with "Reflectorized Boards", so I'm not the only
one who doesn't know what's out there. |-)

--
Mr Notagunzel.
Rail Transportation Connoisseur.
notagunzel@bigfoot.com
(Waiting for any move at http://www.bigfoot.com/~notagunzel)