[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: New Signal Panel at Ringwood
: > Lilydale has a control panel for both Mooroolbark and Lilydale. I would have
: > thought they would move toward single person control of this line, but then
: > they both work automatically. Single line automatic same as Sandringham (and
: > the old St.Kilda)
: Single line automatic? You mean automatic operation of the terminating
: facilities.
: Down Home is reverse for arrival, train arrives and clear points, points operate
: for departure route and signal clears.
: Also at Glen Waverley.
And Williamstown, set for arrival, then the points change and the signal
clears. Only switched in when there is a problem or two Up's or two Down's
in a row. (Remote controlled from Newport 'A')
The interesting thing about Sandringham and Lilydale is the departure signal
doen't clear until it is time to depart as it protects a level crossing.
--
Chris Gordon
http://www.ecr.mu.oz.au/~cmgord