[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: New Signal Panel at Ringwood
- Subject: Re: New Signal Panel at Ringwood
- From: "Tony Gatt" <baulko@tig.com.au>
- Date: Tue, 1 Jun 1999 20:01:50 +1000
- Newsgroups: aus.rail
- Organization: The Internet Group Ltd
- References: <7it87n$r7n$1@mulga.cs.mu.OZ.AU> <7itj0t$qoh$1@toto.tig.com.au> <7itq5c$8cf$1@mulga.cs.mu.OZ.AU>
>
> : When does it go into service?
>
> June 27 is ment to be the change over. (I think the back platform
> will take longer)
They will do a quick job, won't take em long :)
> No Space for remote contol of any other station (apart from Bayswater
which
> is currently controled by a panel in the signal box) it can be switched
in
> or out (most signalmen have it switched it)
I remember Bayswater when it was a panel at Bayswater :)
Lilydale has a control panel for both Mooroolbark and Lilydale. I would have
thought they would move toward single person control of this line, but then
they both work automatically. Single line automatic same as Sandringham (and
the old St.Kilda)
> --
> Chris Gordon
> http://www.ecr.mu.oz.au/~cmgord