[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: QR Moree extension
David Bromage wrote:
> It doesn't quite work that way, but you may be on the right track. With
> 4000hp available up front, I don't see why NR/GSR couldn't add some
> general freight to the train. I don't mean containers, but low profile box
> vans suitable for 110km/h running.
How about attaching the Trailerail vehicles to the rear of the pass?
They're allowed 115km/h are they not? Even if not, are they allowed the
same max permissable speed as an NR class loco?
Cheers,
CH.
--
Craig Haber
albatross@harnessnet.com.au
Manufacturing Systems Engineer (B. Eng, RMIT 1998)
Web Page Designer, Harness Racing, Railways, and Essendon Football Club
fanatic
http://www.harnessnet.com.au/