[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Future for QR Tin sets



Graham Watkins (gwatkins@globec.com.au) wrote:
> Diesels would be unlikely on the Rosewood trains as there are no run round
> facilities at Rosewood. Either a DEL would be required each end or the
> trains would have to run to Grandchester to run round.

Can't you just put a loco on each and and drag the trailing one? Apart
from overhead failures, servicing work would most likely be carried out on
weekends so you'd really only need to cover a reduced shuttle service to
Ipswich. 

An alternative would be to put MU cables through a few SX sets and put a
1720D on each end. 

Cheers
David