[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Gold coast rail extension?





David Bromage wrote:

> Short single-purpose branch lines brings in all sorts of problems. If you
> had branch lines to Surfers and Southport as well as Coolangatta

Coolangatta Airport is not in Coolangatta it is in Bilinga and Coboki
straddleing the Qld/NSW border and if the plans that have been in the local
papers are right then the rail line will come from Tugun into NSW then finish
up near the Airport Terminal after swinging around the end of the airport
which incedently is being renamed the Gold Coast airport if it hasn't allready
been done. This would place the Station in Bilinga and closer to Tweed Heads
West than Coolangatta

> (I'd prefer South Tweed),

I doubt that because the structure to cross Terranora Creek would be quite a
large bridge   ( and it is in NSW ) and if they crossed that then they might
as well cross the Tweed River as well. Then whats to stop a daul gauge line to
Mobal this could have been done with a bit of planing where it could be
assocaited with the Bolingar Range  Pacific Hwy Bypass a
Davo