[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [Qld/WA] QR SMU go to Transperth??



I'm particularly interested by the platform being built on the dual
guage line at Park Road.  AFAIK this is the first QR platform anywhere
on dual guage - showing the way toward an eventual dual guage Browns
Plains / Greenbank line (yeh - wishful thinking).

--Colin

pdwyer wrote:
> 
> In article <3927B320.88165B8D@powerup.com.au>, Colin Weaver
> <weaver@powerup.com.au> wrote:
> 
> >The other problem holding back Citytrain is the long single
> track
> >sections on the Ferny Grove and Cleveland lines.  There were
> plans to
> >duplicate part of the Cleveland line (through Wellington Point)
> but
> >these appear to have been shelved.
> 
> AFAIK these are still going on, Stage I of the Cleveland part
> was the upgrading of the interlocking at Manly  & the
> installation of the new crossover. I'm not involved in the
> project, so I don't know it's status.
> 
> The Park Rd Bypass (for Beenleigh trains to get past Cleveland
> trains) is currently at the Platform building stage.
> 
> And I don't think we'll be shipping units anytime soon. But as
> they say, the truth is always stranger than fiction.
> 
> Seeya!
> 
> * Sent from RemarQ http://www.remarq.com The Internet's Discussion Network *
> The fastest and easiest way to search and participate in Usenet - Free!