Dan said on 9/09/1999 in <37D778B0.419CD8A5@postoffice.csu.edu.au>:

><dotype hml pubc "-//w3c//dtd html 4.0 transitional//en">
><hml>
>Can anyone give any information as to when ballast trains will drop 
ballast
>at
><br>Chiltern for the lengthening of the SG loop?
><p>As of Wednesday the 8th most of, if not all of the earth works have
>been completed for the loop lengthening.
><p>The new set of points have been constructed using timber sleepers and
>are beside the line waiting to be cut and welded in to place.
><p>Large numbers of concrete sleepers have been delivered by truck and
>are stacked beside the line.
><p>The rail was delivered by a GNRS service several weeks ago as indicated
>by previous posts.
><p>So do GNRS have the contract to drop ballast as they did with the rail,
>and are we likely to see 22 or 27 in the North East?