Re: Exhibition Street Bridge and City Link



On 22 Oct 1999 09:13:12 GMT, cmgord@ecr.mu.oz.au (Christopher_Martin
GORDON) wrote, and I selectively quote:

>But you only have about 1 second to read e-tag (this works), process (tolling
>computer too slow) and transmit to e-tag (this works)and it takes about 2-3
>seconds then the car at 100 km/h has gone too far down the road before the
>information to transmit back to the e-tag is ready.

I wonder if this is the only problem.

If it was, the simple solution would be to erect a second gantry (or
even just a transmission tower) say 100 meters down the road from the
first one: it would be much simpler as it doesn't have to video each
car, just transmit a signal back to the e-Tag.  100 meters is about
3.5 sec at 100km/h (100x1000/60/60 = 27.7m/sec), more than enough time
if I use your figures of 2-3 seconds.  

Even if each extra gantry cost $1 million, you'd have to think it
worth it to them to construct them so that they can start collecting
tolls and avoid the huge cash flow drain they must be experiencing.

       
Regards