Re: Bad day at the 'Marsh
- Subject: Re: Bad day at the 'Marsh
- From: "Roderick Smith" <rodsmith@werple.net.au>
- Date: 12 Oct 1999 08:01:35 GMT
- Newsgroups: aus.rail
- Organization: Rail News Victoria
- References: <DtTkNylU4X2x8Wbq7UaXRp6tScP4@4ax.com> <37F215BA.124FC9B8@ancc.com.au> <7su4sn$cev$1@ariel.ucs.unimelb.edu.au> <68HyN7QpHzSsunNW4RJJmO2xoz4X@4ax.com> <01bf13b6$94a6d3c0$552d11cb@rodsmith>
59 km: 13.58
61 km: 18.13 2 km in 4 min 15 sec 28 km/h
63 km: 23.30 2 km in 5 min 17 sec 23 km/h
67 km: 33.15 4 km in 9 min 45 sec 25 km/h (included the easing through
Bank Box Loop)
68 km: 34.29 1 km in 1 min 14 sec 49 km/h (so out of character that it
must be wrong, try 35.29, 2 min 14 sec, 27 km/h). I stopped timing as I
felt that I had established the pattern of the run, and went and helped the
guard pick trackside tomatoes: the driver was throwing out seeds.
--
Regards
Roderick Smith
Rail News Victoria Editor
Roderick Smith <rodsmith@werple.net.au> wrote in article
> I didn't even get 30 km/h for the P on the climb: slightly below,
dropping
> to 22 km/h (I was timing on the kilometre posts).
> Yuri J Sos <steam4me@enternet.com.au> wrote in article
> > On Thu, 30 Sep 1999 08:47:02 +1000, "Stuart Thyer"
> > The P couldn't get over 30km/h from the Armco to Bank Box Loop either
> > (what's the load for a P up the Bank?).