[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Three Position Signalling
On Wed, 6 Oct 1999 11:51:29 +1000, "Notagunzel"
<notagunzel@bigfoot.com> wrote:
>> This is similar to the construction of the Standard Gauge at Newport.
>> Post 144 (behind the box) was turned into a "point indicator" during
>> construction.
>> The "A" light was a marker light, the "B" light was marked "Broad Gauge Only",
>> and the "C" light was marked "Standard Gauge only".
>
ARTC issued a notice a few weeks ago advising that light 'C' can now
apply to BG moves to totty yard OR SG moves to Totty Loop track 2. A
"S & V" indicator is now provided at the top of the signal post.
Also, it is now possible for Yellow indication on light 'B' for an SG
move to totty Loop track 1 but with the Totty departure at stop.
Cheers
Krel
VGR website http://www.castlemaine.net.au/~vgr/
If competition is so good how come there is only one Competition Commision?