[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [Melb.] Hillside Express Shopper Trains
On 25 Dec 1999 12:24:49 GMT, cmgord@ecr.mu.oz.au (Christopher_Martin
GORDON) wrote:
>And just more trains to set the level crossings at Heatherdale, Mitcham,
>Rooks, Springvale, Blackburn and Middleborough roads to the wrong
>stopping pattern (ie express/stopper) and it will be only a matter of
>time before there is an accident either by the level crossing not
>protecting the train or staying down too long and someone driving around the
>crossing.
Are you sure that the LC at Mitcham operates this way? During normal
operation (ie, trains stopping all station in that area) the gates
seem to drop for a down train down long, long before the train arrives
in the platform. Unlike many other stations where the booms only
begin to come down as the train stops.
JD
==========================================================
John Dennis jdennis@acslink.net.au
Melbourne denjo02@cai.com
Australia Home of the Dutton Bay Tramway
DBT URL: http://www.acslink.net.au/~jdennis/dbt.html