[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Line beyond......



In article <39D1CBA3.D1C4727B@efs.mq.edu.au>,
  Eddie Oliver <eoliver@efs.mq.edu.au> wrote:
> signal_spotter@my-deja.com wrote:
> >
> > It's not being totally resignalled, it's just getting a new signal
on
> > the northern end of the loop platform and a new catchpoint (in the
main
> > line at the southern end) to allow simultaneous entry into the main
and
> > loop from each end. And the up and down starters are getting a
yellow
> > aspect. And there is a new Up signal at Yallah which will be
controlled
> > from Dapto. Now if you've been into the relay room at Dapto you'll
find
> > that it's chockers. We've done a couple of recent jobs there
> > (trainstops and the new siding platform) which has filled it to
> > capacity. So to add more relays was out of the question. So instead
we
> > are putting in a Westrace computer based signalling system and
> > therefore we're redesigning the interlocking requirements. Are you
> > happy now?
>
> There was no suggestion that anyone was unhappy; the applicable word
was
> perhaps "puzzled".
>
> However since you are favourably disposed to making us happy, are you
in
> a position to give us similar information about the resignalling
> elsewhere in this project?
>
> Eddie
>
Sure, no problem as long as I'm not bound by contractual limitations.

regards Ian
Signal Design Engineer



Sent via Deja.com http://www.deja.com/
Before you buy.