[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [NSW] Olympic Sprint (was Why keep Clyde?)
"Chris Downs" <cvdowns@ozemail.com.au> wrote in message
3NPO5.22816$SF5.458154@ozemail.com.au">news:3NPO5.22816$SF5.458154@ozemail.com.au...
> I think that outside significant passenger generating events/busy times the
> Olympic Sprint could be an "on demand" service.
>
> Just one two car set. If a passenger arrives at OP or Lidcombe and there is
> no train you have a call button/intercom (with a video link to deter
> hoaxers) to call the train. If the train is there away you go with no wait.
> Run it as DOO or have a person at each end that double as driver/guard to
> minimise turnaround time at Lidcombe.
1 minute is too long?