Re: Construction Contracts for trains/trams



Hi,

The previous government should have factored it into their contracts. For 
Jeff to tell us, the people, that all our new rollingstock is going to be 
built locally, hence more jobs will be created, only to find (conveniently) 
after him being voted out, that Adtranz and NE are rumoured to have split. 
Makes you wonder how much he was paying while he was still in power.

Next few months will indeed be interesting, lets watch Jeff clock up the 
corruption charges. Wonder if he's heard that cliche "do not bite the hand 
that feeds you".

Regards
Michael

David Bromage said in message <Sw4V3.20$874.341704@news0.optus.net.au>, I 
therefore quote:

>The fault doesn't entirely lie with the previous government. The falling
>out of National Express and Adtranz had a lot to do with it. The terms of
>the contracts were so unbelivable that Adtranz pulled out, and nobody else
>is willing to take their place. The only option is to import.

-- 