David Bennetts <davibenn@pcug.org.au> wrote in message
374b2ab9.0@newshost.pcug.org.au">news:374b2ab9.0@newshost.pcug.org.au...

**SNIP**

> I also
> noted some major work going on between Chatswood and Artarmon in the
earthen
> cutting, with pre-cast concrete panels being used to shore up the walls.
No
> doubt this work is in preparation for the laying of the two extra tracks.

I hate to point this out, but the retaining wall construction has nothing to
do with the preperation for quadruplication, but everything to do with an
unstable cutting that was/is slumping towards to track.

Ben Staples