[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Tocamwal and North
Any chance that the line could be extended in standard gauge to
start standardisation northward, or would it be more likely that this
would not happen for a long time, or would it be more likely that
hell will freeze
over!!?
The
only talk I have heard goes like this:_
The
bridges are in a sad condition, and a loading loop could be built this side
of the one at Nerandera, A modern discharge pipe would be built across the
old bridge and specialised loading facilities would allow rapid loading of a
captive standard gauge train, which would. run back and forwards to Tocumwal
on the SG. [A one in eight sleeper relay and some other work could get the
line open quickly.
At
Tocumwal a new loop with a high speed transfer system similar to Dunolly
could make an Economic alternative to running the wheat to
Woolongong.
This
is not Official...it is only informed talk at work.
Recently
in NSW an Election was held and a local Newspaper quoted Carr as
promising that Freight Rail would rebuild the whole line to Tocumwakl, and
operate trains to stop Victoria poaching its loads???? Who
knows.
Rod
;o)