[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Overland services to be cut??



Krel wrote:
> When it is switched in Dimboola is controlled by a signaller in
> conjunction with the Western Train Controller for moves that involve
> the mainline (no 1 track). All other moves the Signaller controls.
> When switched out the Train Controller controls the main line signals
> only. Since Dimboola Loop is only 2 km up the hill it is quite rare
> for Dimboola Station to be used for a cross unless one train is
> awaiting a crew.

So Dimboola will need to be switched in for this move?   

Cheers,
CH.
-- 
Craig Haber
albatross@harnessnet.com.au
Manufacturing Systems Engineer (B. Eng, RMIT 1998)
Web Page Designer, Harness Racing, Railways, and Essendon Football Club
fanatic
http://www.harnessnet.com.au/