[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: FP-11 Withdrawal Date



On Tue, 16 Jun 1998 08:31:41 +1000, "Chris Stratton"
<stratton.chris.cp@bhp.com.au> wrote:

>I have the following photos of FPs in service
>
>FP13 at Wollongong 11/5/83
>FP12 at Kempsey 11/7/84
>FP13 at Hurstville 9/10/84
>FP12 at Yerrinbool 18/3/85
>FP12 at Coolamon 3/4/85

Interesting, the logbook in FP-12 must have been an older one, I just
assumed that it was its final logbook, or mabye it was Dec '85, it's
been about 6 months since I saw it :)

I'd be interested to know why the railways stripped 12 and not 11, 12
being considerably more modern. FP-7 is also a possible goer, it is in
the Goulburn Roundhouse, needs an overhaul but is basically ok. FP-12
is without an engine, transmission and most of its electrical cabinet,
and FP-10 has an engine, no transmission, but is missing some control
gear.

I've heard FP-8 runs, does anyone know the status of FP-9 and FP-13 at
Dorrigo?

Cheers
Karl