[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: WS2 National Rail train




Tezza wrote in message
<3a94d411$0$25510$7f31c96c@news01.syd.optusnet.com.au>...
>
>"BEE EFF" <mcreely@pnc.com.au> wrote in message
>3A944629.E1C68CEA@pnc.com.au">news:3A944629.E1C68CEA@pnc.com.au...
>| Nathan & Mel,
>|
>| WS2 / SW3 runs on avereage 5 days a week(Mon - Fri) it is rostered to
>depart Pt
>| Kembla  11:35 hrs and arrive Boral Siding at Cooks River at 15:20 hrs
>after
>| running around at Rozelle. It normally has a total of 2400 tonnes (in 26
>| wagons)of 10 & 20 mm bluemetal(for concrete production). After it has
>unloaded
>| it then runs via Rozelle or the Banka back to Port Kembla for crew change
>then
>| down to Dunmore Quarry(near Shell Harbour) to be loaded again.
>
>The crew must be pretty close to busting by then wouldn't they? I didn't
>realise this train was still running after FC lost it. I thought the siding
>was closed.
>
No Tezza, generally no long hours on this job. A PK crew takes SW3 from PK
to Dunmore and returns the loaded WS2. The train is generally waiting in PK
yard for the crews to sign on.