Re: [NSW] Banyabba crossing loop disconnected



Eddie Oliver <eoliver@efs.mq.edu.au> wrote in message
3929077F.F12A92D5@efs.mq.edu.au">news:3929077F.F12A92D5@efs.mq.edu.au...
> Chris Downs wrote:

> Because it separates the phases of the work. If the points etc. are
> removed, the detection circuitry on the points can just be bridged, and
> the CTC system then thinks that the points are set for the main line and
> the signals etc can then work accordingly. No alterations are needed to
> the CTC system, so the alterations can be done at some later stage (if
> at all).

Ahhhh yes, but are the single line ccts modified?

Or is it up to Control not to dispatch 2 trains towards a non crossing
station?

--
HXP1
(now with v6.08 software)