Layer 1 Layer 2 Layer 3 Layer 4 Layer 5 Layer 6 Layer 7 Layer 8 Layer 9 Layer 10 Layer 11 Layer 12 Layer 13 Layer 14 Layer 15 Layer 16 Layer 17 Layer 18

Crossings

Official names of the level crossings/subways/bridges
Level Crossings
Foot Crossings - Foot Bridges - Subways
Bridges - Road & Rail

 

Official names of the level crossings/subways/bridges
courtesy Chris Gordon

Legend:
FO - Foot Only
UL - Underline Bridge
OL - Overline Bridge
BB - Boom Barriers
PG - Pedestrain gates (power operated)
PO - Pedestrian Open Style (crib crossing)
- - T - Tramway

Moonee Ponds Creek UL
Llyod Street UL.Cat3
Arden Street OL FO
Macaulay Road BB+PG
Macaulay Road Subway UL FO
Smith Street Subway UL FO
Racecourse Road
(T - Tramway)
ULT.Cat3
Newmarket Subway UL FO
Finsbury Subway UL FO
Dover Street Footbridge OL FO
Kent Street OL
Ascot Vale Road UL.Cat 2
Bloomfield Road UL.Cat 2
Ascot Vale Subway UL FO
Maribynong Road OLT
Eglington Street Footbridge OL FO
Puckle Street BB+PG
Puckle Street Subway Ul FO
Moonee Ponds Subway UL FO
Taylor Street/Ardmillan Road PG FO
Park Street BB+PG
Buckley Street BB+PG
Buckley Street Subway UL FO
Essendon Central Subway UL FO
Essendon Subway UL FO
Mount Alexander Road ULT.Cat 2
Brewster Street footbridge OL FO
Napier Street OL
Glenbervie subway UL FO
Strathmore Subway UL FO
Pascoe Vale Road OL
Moonee Ponds Creek UL
Pascoe Vale Road/Freeway Off Ramp OL
Tullamarine Freeway OL
Bell Street on ramp OL
Bell Street off ramp OL
O'Heas Street/Tate Street PO FO
Gaffney Street BB+PG
Austin Cresent Reserve UL
Devon Road BB+PO
Oak Park Subway UL FO
Barina Road Subway UL FO
Glenroy Road BB+PG
Glenroy Subway UL FO
Jacana Footbridge OL FO
Western Ring Road UL.Cat 3
Standard Gauge Flyover OL
Camp Road OL
Broadmeadows Subway   UL FO
   
Ascot Vale Road BB+PG
Epsom Road ULT.Cat 3
Racecourse Subway UL FO

Bridge Structures

Cat.2 - Exposed Beam construction including prestressed concrete girders with a timber, steel or concrete deck with external crash beams provided immediately in advance of the bridges' superstructure (in other words if a truck hits the bridge, after it gets past the crash beams, then the bridge is stuffed)


Cat.3 - Steel beams totally encased in concrete to form a solid superstructure and also include masonary arches and reinforced concrete
structures (in other words, a bomb to destroy bridge)