[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Safeworking the safe way



: You sure? Signal diagram 59/98 (dated 19/11/98) still shows the track all the
: way from Upfield to Somerton as being in place. According to the diagram the
: mainline is now enclosed by the Upfield security compound. Signal UFD509 is a
: home signal with low speed for the security compound tracks. I doubt the would
: put a home signal there if the mainline was closed.


The staff and ticket was withdrawn on the 22.12.98 and is now worked under 
siding conditions.  The section between the end of No1 and no2 road and post 
75 is out of use.

Same at Lilydale Home signals are provided for moves to the sidings
(only showing low speed caution) but then what is the current position
of the Lilydale-Coldstream section, I think it is listed as out of use
and no longer on any signalling diagram.

--
Chris Gordon
http://www.ecr.mu.oz.au/~cmgord