[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: ATP
bub123@hotmail.com wrote in message <36F4BEC0.3019@hotmail.com>...
>> With the QR ATC system, the driver is required to enter a set of figures
>> into the ATC console before the journey commences. The figures are
included
>> on the bottom of the train sheet and tells the computer the length,
weight
>> and maximum permissible speed of the train. A bank of thumbwheels are
used
>> to enter the information.
>
>Just to correct this the information on the Train Wire does not include
>weight.
>
>That information is done by the Rics system that knows what vehicles are
>in the train and how well they brake etc, this is then calculated to a
>deceleration figure which is entered in the thumb wheels.
>
>Brian
Hi Brian. You and I both know what retardation figures are but for someone
who doesn't work for QR, chances are they probably wouldn't know what the
hell they were. I always post to this group using terms that everyone will
understand. Don't forget, the Mexicans read this too!!!
Regards
Matt Smith
Brisbane, Queensland
Reply to matticue@hotmail.com
You can't slam a revolving door.
- References:
- ATP
- From: phaedrus@ultra.net.au (Darryl Georgee)
- Re: ATP
- From: "bazt" <bazt@tpgi.com.au>
- Re: ATP
- From: phaedrus@ultra.net.au (Darryl Georgee)
- Re: ATP
- From: mcfergus@my-dejanews.com
- Re: ATP
- From: "MattyQ" <matticue@corplink.com.au>
- Re: ATP
- From: mcfergus@my-dejanews.com
- Re: ATP
- From: "MattyQ" <matticue@corplink.com.au>
- Re: ATP