John Wayman wrote: > A smooth ride and running to a timetable can often not be compatible. The late Northern Tablelands Express was well known for rough riding when running to timetable. Comeng took a ride index meter on the train not long before it was taken over by the XPT. It peaked at 5.4 between Werris Creek and Tamworth! Cheers David