[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: R711 trip to St. Arnaud on 4th July
G'day,
Notagunzel wrote:
> Roderick Smith wrote:
>
> > * significant delays waiting for manual train orders at several stations,
> > as section-authority working was not working.
I worked it out at 118mins stationary acc. safeworking. That doesn't include
time for slowing down and starting again (compared to running through locations
at up to 100km/h).
A couple of other delays were passengers who failed to use their grey matter and
held the show up for a few mins here and there.
> This was aggregated on the Up at
> the Block Points between Ballarat & Nth Geelong, because the train can't
> relinquish the rear authority until it has passed the block point, and
> can't pass the block point until a forward authority is held, thus
> meaning a stop at each location.
I think the runaround at Sutherland Loop was a similar example - this move took
30 mins. They'd have needed an authority to go beyond the down end points...then
another to come back...etc
> One notable point was the train was actually a WCR train, VLP wasn't
> involved at all. Conductor Haber actually worked the full shift
> himself, & only 2 sets of steam crew were used.
T'was very hard work, but a good day, and well worthwhile. The run up Ingliston
Bank was just sensational. A couple of slips between up towards the armco pipe
didn't help, but didn't she roar up there!! I've got all the times if anybody
wants them.
Cheers,
CH.
--
Craig Haber
albatross@harnessnet.com.au
http://www.harnessnet.com.au/ch/
Proofread carefully to see if you any words out