[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Narrandera to Tocumwal



Maurie Daly <mauried@commslab.gov.au> wrote in message
mauried.419.37CC6528@commslab.gov.au">news:mauried.419.37CC6528@commslab.gov.au...
> In light of the recent threads on the possibility of reopeneing this
line,does
> anyone know the status of the Murrumbidgee River bridge at Narrandera?
> Would this bridge have to be rebuilt?
> Given that the line was only ever a light branch line ,was the bridge
designed
> with this in mind .

That is a major consideration, and is probably why the line will not go
'through' and will not have the bridge rebuilt, therefore it is really a
Tocumwal to Narrandera line, not Vice-Versa.