Re: GNRS and other matters.



On Wed, 04 Aug 1999 14:41:03 +1000, david <david@nmit.vic.edu.au>
wrote:

>
>
>Stephen Devenish wrote: - and I cut:
>
>> >Anyone know what loops are being lenghthened and in what order.?
>> >Over the border there is work on extending the down end of gerogery Loop
>> >but no evidence at all of loop lengthening at Albury,which is odd as it
>> >would
>> >be the easiest loop to lenghthen .
>> Chiltern (Down end), Glenrowan (up end or down depending on cost) , Violet
>> Town (Down end), Wallan (Down end), Somerton (Down end), and Horsham(Down
>> end). In most cases the cripple roads will be removed.
>
>Somerton, lenghtened on the down end - will that affect the duel gauge track to
>the Cement silo ???
>
Not really. The SG siding will be moved and the extended loop will end
before the dual gauge starts.

Cheers

Krel