[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Glenlee Grade Separation



On 3 Apr 1999 11:07:51 GMT, "fryg" <fryg@sydpcug.org.au> wrote:

>I am trying to find the approximate date that the grade separation works on
>the NSW main southern line near the Glenlee Coal Siding were carried out.
>Anyone have any ideas?
>
Up track regraded 2/4/1892 from 36.64m to 38.12m 1 in 100 (was 1 in
70).
Down track regraded 25/3/1892 from 35.40m to 36.76m 1 in 100 (was 1 in
80). 

Cheers

Krel

Just another eccentric crank.