[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Batman - Upfield Signalling Changes
SW 145.98
Commencing from 2000 on Friday 13.11.98 to 0400 on Monday 16.11.98,
the following signalling and Infrastructure alterations will be made
between Batman and Upfield:
* The Double Line Block Telegraph System of Signalling between
Batman and Fawkner will be abolished.
* The Train Staff and Ticket System of Signalling between Fawkner and
Upfield will be abolished.
* The Automatic and Track Control System of Signalling between Gowrie
and Upfield will be commissioned.
* The new portion of line between Fawkner and Gowrie will be
commissioned. The section from Fawkner to Gowrie will be double
line.
* Fawkner signal box will be de-commissioned.
* For an interim period Batman signal box will remain for the
operation of interlocked gates at Gaffney Street level crossing.
The level crossing will continue to be protected by Home Signals.
* Batman Down Starting Signal Post No. 56 will be abolished.
* Batman Up Home Signal Post No. 57 will be abolished.