Re: St Leonards Railway Station



Major works would be required for the North Sydney to St. Leonards
section,
although most of it already has space for two additional tracks.

Some of the major works required are:

- Major works at Waverton to allow 4 tracks & platforms
- New 2 track Tunnel at Waverton
- Removal of rocks under Bridge End's Road overbridge
- New road overbridge at Shirley Road
- Major works at Wollstonecraft to allow 4 tracks & plaforms
- Additional 2 track railway underbridge at Russell Street
- New road overbridge at River Road
- Removals of rocks under the Pacific Highway Overbridge

This section will be a costly to construct so it may only exist in our
dreams,
but I still hope they build it! Not too sure what's happening at St.
Leonards
Station.

St. Leonards to Chatswood probably requires less work because some of
the road
overbridges were replaced with 4 track wide bridges and the underbridge
over the
Gore hill Freeway can take 4 tracks.

- New Road overbridge at Ella Street
- Major works at Artarmon to allow 4 tracks & platforms
- Additional 2 track railway underbridge at Brand Street
- Clearing of cutting, etc between Artarmon & Chatswood
- New Platform at Chatswood

Jon Lau



ROY HOWARTH wrote:

> Not sure how many platforms to be built for St Leonards, but as far as I
> know, there are no plans to quadruple the section betw Nth Sydney &
> Chatswood. Reasonable to assume that only 2 platforms will be req'd for
> St Leonards.
>
> In any case considerable earthworks would be req'd to convert Waverton &
> Wollstonecraft stations and Bay Road Tunnel to four tracks for limited
> gain.
>
> Roy H
>
> "Garry Hoddinett" <hoddos@netspace.net.au> wrote:
> >The new platforms (at long last!) seem to be taking shape at St Leonards.
> >Does anyone know how many platforms are going to be constructed?  The North
> >Shore has provision for 4 tracks from North Sydney to Chatswood but will the
> >new St Leonards Station have provision for four platforms if only two should
> >be built during the current building works?
> >