Re: Boronia Open day report

Tony (tony_g_1@hotmail.com)
Sat, 11 Apr 1998 00:02:19 -0700

Sources have it that the signalling work for Bayswater was commissioned
between 4-5th of April.

I did notice the signalling was working on Wed 8th, and I believe the
facility to be opening in about 2-3 months.

Chris Gordon wrote:
*snipped the first bit..*
> >
>
> I used to have a picture on my homepage. I am re-doing my homepage at the
> moment but if you go to http://www.ecr.mu.oz.au/~cmgord/trains then you will
> see a picture of the Bayswater Light Repare Centre layout.
>
> It is still under construction, but is designed to hold two trains overnight
> and three for fixing. They have had a couple of weekend planned to close the
> line and connect the Sidings. They probability do Bornia at the same time.
>
> Chris Gordon
> cmgord@ecr.mu.oz.au
> http://www.ecr.mu.oz.au/~cmgord