Re: Boronia Open day report

L & D (daisyw@ozemail.com.au)
Wed, 08 Apr 1998 20:56:56 +1000

I know this is not about Boronia but Bayswater passing through there last
year I saw that there was a maintenance centre being built I was wondering
if it has been finished and whether it had been connected to the main line
does anyone have any details of the yard how many sidings? will there be
provision for train stabling ? and is there any diagrams of the signaling
yet?

Peter Berrett VK3PZ wrote:

> Today Sun 5/4/98 was open day at the Boronia rail crossing construction
> site.
>
> Mrs VK3PZ and I went down and had a look. The open day was very popular
> (thousands of people came and there were very long queues - even at the
> end of the day) and it was pleasing to see that Rotary had tins
> overflowing with donations for the Salvation Army. The project is well
> underway. the big ditch has been dug out and a station with central
> platform is about half complete. About half the tunnel has been
> excavated and covered but the major part of the work (under Boronia
> road) is still underway.
>
> One of the notable architectural aspects is the use of a blue glazed
> brick on some walls. There is a small structure (like a small wall)
> built out of this brick behind Mcdonalds but its purpose remains a
> mystery. Why was it built?
>
> It will be interesting to see whether trains will keep running when the
> use of the old station is stopped and the new station commences to be
> used. It could be done using single line working ie a single line spur
> off the old line would be connected at either end and then trains in
> both direction would use this one track whilst the second track is being
> built and the old line is demolished.
>
> Then again they may just shut the line down for several weeks.
>
> cheers peter