Below is a rough diagram of the tracks after the 17/18th shutdown.
Please forgive my drawing skills, and also the scale of the drawing.
To East Hills
| \
| \
\ \
To Arncliffe \ \ To Tempe/Sydney
----\----------------------------------\------------\------ Local Up
--\--\----------------------------------\------------------ Local Down
---\--\---------------------------------------------------- Main Up
----\--------\ /---- Main Down
\ /
\------------------------------------/
The above shows the new points installed near Arncliffe, the
modifications done to the East Hills line last month, and also the
movement of the down Main Illawarra.
Below is a rough diagram of the tracks after the 24/25th weekend.
To East Hills
| \
| \
\ \
To Arncliffe \ \ To Tempe/Sydney
----\----------------------------------\------------\------ Local Up
--\--\----------------------------------\------------------ Local Down
---\--\---------------\ ---------------- /----------- Main Up
----\--------\ \ / /---- Main Down
\ \--------------------/ /
\------------------------------------/
The above drawing shows the very interesting track config that I am
curious about. Does anyone know why this has been done?? I cannot see
any logical reason for doing this, as they have placed track in the
area that I thought would be used for the new Arncliffe North Station.
The only explanation I can give is the line has been moved temporarily
to allow some work on the station.
Also does anyone know if this was done during a shutdown, or were
the trains able to use the local lines during the weekend?? (I spent
most of last week and the weekend in Canberra, and Monday morning I
was suprised to see the new track)
-------------------------------------------------------