[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: (NSW) trackwork




"signal engineer" <signal_engineer@MailAndNews.com> wrote in message
3B122792@MailAndNews.com">news:3B122792@MailAndNews.com...
> >===== Original Message From "Paul Jones" <dj_wiseguy2_nospam@yahoo.com>
=====
>
> (Flaggies and
> Lookouts) can be a
> bit
> over-zealous such as ordering us from the track when a train is not due
for
> about 10 minutes.

Ian, how can someone be overzealous about saving your life? Not sure about
NSW but QR rules state track MUST be clear 10 minutes before the EXPECTED
arrival time of the train. Now this may be a pain in the arse to you but
it's your life they're saving and a line has to be drawn somewhere. If
stopping for 10 minutes is such a problem to your work method, then that is
purely bad time management planning.


--
Matt Smith
Brisbane, Australia

Email - mattyq1009 at dingoblue dot net dot au

Notice - All comments and opinions made herein are that of the author only
and do not represent the official view of QR. All text included in this post
(and/or reply) is copyright to the author. This message may not be
reproduced in whole or in part without the express written permission of the
author.