[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [NSW] RSA takes two weeks to repair broken points on CityRail line



Chris Downs wrote:
n> 
> On through running Carlingford trains, about 15 years ago a down Mountains
> U-boat I was on (well loaded with fare paying passengers) was diverted through
> Clyde Yard on the line closest to the up west.  Is this no longer possible?

Possible, but point clipping required because of points not equipped
with facing point locks.