[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Alstom for Hillside/Yarra tram [Melbourne Aust]
David Bromage <dbromage@fang.omni.com.au> said:
>The traction control is very different. Assuming you didn't a bogie
>exchange, you couldn't run a 4D in multiple with a Tangara. The 4D was
>designed to run in mulitple with a Comeng.
Both use 1500vdc Chopper control. Most likely the same unit which fits into
the roof above the drivers cab.
This, AFAIK is a software issue, not hardware. Reprogram a 4D TMS to
Tangara spec and it should be able to work (after guage and coupler
modification) in multiple with a Tangara. IIRC, the 4D was delivered with
Tangara specs, and programmed to work to Comeng specs.
(Going by knowledge that I've gathered from this newsgroup, and people who
have worked with them).
Michael