[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: SLR - Extension construction



geoff dawson wrote in message ...
>If it was desired to extend the light rail to Summer Hill or Dulwich Hill
>(which I would advocate), would there be any physical or technical
>impediment to sharing the line with goods trains? Assuming that the
>frequency was such that paths for the goods trains could be found.


Given that the freight operations to Rozelle are rather infrequent, what
would be the chance of having a single-track de-electrified freight line and
a single-track 750V electrified Light Rail line?  Maybe the Light Rail would
need a crossing loop or two.

Just a thought!

Bill