Re: [VIC] Bendigo Rattler



Hi,

James Brook wrote:

> After
> the special cleared the Maryborough line, there was a malfunction with
> the track circuits which meant they couldn't switch the points to allow
> the down pass onto the up line.

Track circuit on the Maryborough line was showing occupied, hence the points from the
Maryborough line wouldn't return to normal.  Signalman went out and found nothing
'shorting' the track (a defective relay in the control circuits was found later - ie
there was nothing physically wrong with the track circuit itself), and tried to operate
the points by hand - no luck, his key wouldn't unlock the points! (D'oh!).

> It took nearly an hour to find a way to
> switch the points manually and the down pass finally arrived in the
> station approximately an hour late.

67 mins late.

> When I left Castlemaine on the up
> Swan Hill pass at about 1920, the special was still in the No 2
> platform.

The down Swan Hill pass was then due and got the run, so we were delayed another hour,
got away from Castlemaine finally at 1935, reaching Bendigo at 2032.

Cheers,
Craig.
--
Craig Haber