[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Melbourne Darwin Railway




David Bromage <dbromage@fang.omni.com.au> wrote in message
Jnac5.30$XZ1.392606@news0.optus.net.au">news:Jnac5.30$XZ1.392606@news0.optus.net.au...
> James C (noemail@emailsux.com) wrote:
>
> > David Bromage <dbromage@fang.omni.com.au> wrote in message
> > k6Ab5.70$s84.638630@news0.optus.net.au">news:k6Ab5.70$s84.638630@news0.optus.net.au...
> > > James C (noemail@emailsux.com) wrote:
> > > > I still prefers to use 1.3b$ to upgrade exist interstate lines.
> > Especially
> > > > North Coast line,
> > >
> > > Sustained 100km/h freight running on the North Coast????
> > interesting enough this afternoon I read an article about this
> > project(mel-darwin), this project will gurantee a 24 hours freight
trainsit
> > time between Brisbane and Melbourne......
>
> I think the journos are still confusing the two proposals. The 300km/h
> version has long since been abandoned.
No....24 hours FREIGHT trainsit time between Melbourne and Brisbane.

if is 300kph it would take a llot less then that.

Cheers
james


> Cheers
> David