[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: QR diesel tilt train design released.





thalytgv@my-deja.com wrote:

> > In a surprise move, the train will not have sleeping accommodation
> despite
> > the expected 27 hour journey (reduced from 32 hours). The consist will
> > permit a further 5 coaches to be added to the existing consist of 7 so
> > sleeper cars may be planned in the future.

> Is there a difficulty to install sleeping berths on a tilt train?

I would imagine the difficulty is installing yourself in the sleeper so that
you are not tipped out <g>!

Sam Eades