[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Victorian Closure Rumours
: > Heard on the grape vine that Westall Siding HUME ??? in Melbourne is due to
: > be removed this weekend. The information came from a person with Bayside Trains.
: > Can anyone shed some light on this siding? Is it related to the APEX siding at Westall?
: The Humes siding was an electrified siding which formed 2 tracks within
: the Humes' plant at Westall. It is still connected via a set of trailing
: points to the up Dandenong line, approximately 200 metres up from the
: Westall platform. The current industrial site is being used by an
: engineering company. There are still sevaral other former industrial
: sidings around the area.
That is correct, the points ahve beend spiked out of use for some time now.
--
Chris Gordon
http://www.ecr.mu.oz.au/~cmgord
+++++++++++++++++++++++++++++++++++++++++++++
e-mail: cmgord@ecr.mu.oz.au
e-mail: cmgord@alphalink.com.au (pictures)
ICQ: 32989450
Mobile Phone: Number on Request.