[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: SpeedRail
Matthew Geier wrote:
> In a space shorter than the engine dive,
not much
> dig under 8 tracks, then come
> up the other side and join the existing NSR tracks before the portal,
Why "before the portal"? If you're digging a tunnel anyway, there seems
little reason to come out into the "open air" before you then go
underground again.
> not disrupt in any great way the operation of the flyovers. The approach
> grades would be rather steep to get under the existing lines and up the
> other side.
One of the great things about VFTs is that they are rather powerful.
Eddie