> It would make more sense to extend the Murwillumbah line and meet up with > the narrow gauge line at Coolangatta. The majority of Murwillumbah traffic > is to/from the Gold Coast, so this would be the logical desgination. Coolangatta? Do you mean the proposed-before-the-election extension from the terminus at Robina? John McCandless johnmc@topend.com.au