[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Sprinter



The blurb on Sprinters stated that all critical functions would be
duplicated so that a failure would not disable the vehicle.  This was after
the experience with the DRCs.  The observation here indicates that the
objective was achieved.
-- 
Regards
Roderick Smith
Rail News Victoria Editor

grover <dgrove02@postoffice.csu.edu.au> wrote in article 
> Today, 6th of May the 3:55pm Sprinter service from Albury to Melbourne
> ran with only one of its two engines due to an electrical fault in
> engine number 1s inverter.
> Sprinter’s auto transmission did a lot of gear hunting trying to find
> right gear ratio for the high load it was under.  It also lost a lot of
> time due slow speed.
> I was rather surprised that it was allowed to run in this state of
> disrepair.