[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Beecroft Bank
Rod Gayford wrote:
> At about 6pm today I observed a down NR Steel hauled by 2 NR Class slowly
> moving through Cheltenham station. The steel train backed onto another NR
> freight just past the signal at the end of Cheltenham station. The NR
> container freight extended all the way to signal just before Beecroft
> station. It was also hauled by 2 NR Class (one being one of the indigenous
> painted units). Even with assistance from the rear the extended train had
> a great deal of difficulty in lifting its load. It eventually cleared the
> section at approx. 5.25 pm. It was travelling at a fair old rate of knots
> by the time the last freight car cleared the section.
So.. It took 23 hours 25 minutes to clear the section?
--
David Johnson
CityRail Guard
trainman@ozemail.com.au
http://www.ozemail.com.au/~trainman/